....and there's yet another box that didn't make it into that picture. Each box contains around 500 cards. The entire figure from the last post is only 432 cards.What to build next?
Douglas Adams, "Mostly Harmless"
....and there's yet another box that didn't make it into that picture. Each box contains around 500 cards. The entire figure from the last post is only 432 cards.
He's a little over four feet tall (the magazine is for scale), and is comprised of about 432 out-of-date business cards (mine and a coworker's). No glue, no tape, just the cards. The secret? Click here. 

The huge yellow somethings went unnoticed at Goonhilly, they passed over Cape Canaveral without a blip, Woomera and Jodrell Bank looked straight through them—which was a pity because it was exactly the sort of thing they'd been looking for all these yearsIt's disheartening to hear that other countries are slowly dismantling their astronomy research base. The US has been cutting funding for years, most notably with NASA focusing more on engineering projects than on research. Isn't it interesting how the most publicly appealing of sciences can be the first to the chopping block?
—Douglas Adams, The Hitchhiker's Guide to the Galaxy
Galt, in a statement, rejected the accusations and vowed to defend itself. The company contended that the government agencies overseeing the site often issued conflicting directives that resulted in massive slowdowns and cost overruns.But unlike Bovis, who is one of the largest contractors around the city, Galt has no named spokesperson, and no contact person for the press. From where did this statement originate? Who wrote it? Who will take responsibility?
"Every detail of the work was scrutinized, criticized and finally approved before it could be done," the statement said. "It is inconceivable that these agencies, including OSHA, whose trained inspectors were present at the site on a daily basis, could not detect, or were oblivious to the alleged 'serious and willful' violations that supposedly existed prior to the fire."
The statement said that if government regulators, including OSHA, failed to discover the alleged violations before the fire, they should be the ones charged with failing to do their duty.
OSHA cited the two contractors for a total of $464,500 in proposed fines. They issued three willful and 22 serious citations to Galt, carrying fines of $271,500 and 2 willful and 17 serious citations to Bovis, with $193,000 in fines.The article mentions one anonymous executive from the equally-anonymous John Galt company who is upset over the fines. He claims that some of the citations are for things that regulators ordered the company to do (like sealing off the stairwells which had asbestos in the walls). But there is a very ominous, yet familiar, line: "A spokesman for the Galt company, which is no longer operating, could not be reached for comment..." No longer operating. I wonder just who was served with these citations, and who will be paying them.
The agency defines a willful violation as one committed "with plain indifference to or intentional disregard for employee safety and health." A serious citation, according to the agency, is one in which "death or serious physical harm is likely to result from a hazard about which the employer knew or should have known."
A press release issued by the agency did not give any details about the arrangement with LVI, including the cost of the contract, the date on which LVI would start work or how long the job would take....and this:
As part of the new arrangement, the development corporation, Bovis and LVI have altered the deconstruction plan. As workers removed asbestos from each floor, crews demolished the clean floors. Under a new two-stage process, LVI will first remove the asbestos throughout the building and then take down the tower. Work could take another year, construction executives say.Later on, it talks about the deal with JP Morgan Chase, who has plans to build a new 42-story tower on the site. The Port Authority is supposed to hand over the land to JP Morgan Chase in September 2008, though we all know how good the Port Authority is at finishing it's projects on time. And of course, the Port Authority has it's bases covered:
Anthony Shorris, executive director of the Port Authority, said that the authority still planned to deliver the site in September, although, he added, the agreement with Chase included a six-month extension.I guess we'll have to wait and see. From the looks of it, nothing will change on the outside until the asbestos is all removed. I hope that doesn't take long. I'm still looking forward to having the great view of downtown I was promised when the building was supposed to be finished last fall.
Yes, there is a noise code in the city, but as you may know, the Port Authority is exempt from state and city regulations.
We are prepared to resolve claims. We are located at the Ritz Carlton, Room 417. Our hours of operation are:We still don't get to see the details of this mysterious release form. But hopefully they'll post it soon.
Thursday, December 6 3PM – 8:30 PM
Friday, December 7 3PM – 8:30 PM
Saturday, December 8 8AM – 6:00 PM.
The Claims Hotline (1-866-902-3276) will remain active until further notice.
Since the 90 West Street building was certified by New York City’s Department of Housing, Preservation & Development (HPD) for occupancy on Tuesday, December 3, 2007, we are resolving claims for a total payment of $6,000 per unit. This represents the $750 per day for the days of November 26, 2007 through December 2, 2007 – a total of 8 days. If you have special circumstances that prevented your return on December 3, 2007, please refer to Point 5 below. Please only bring documentation if your claim exceeds $6,000. As we have stated to many of you, this system is designed to streamline the process. For scheduling purposes, please send an e-mail to 90West@Jratpa.com if you are coming in so we can coordinate your visit.
In order to process a settlement, you will be required to do the following:
1) Visit the Center and bring a government issued photo identification and a copy of your lease.
2) Sign a Release, which will be posted on our website for review. Each lessee and, if applicable, sub-lessee per unit must sign the Release. The only exception will be for military deployment.
3) Only lessees with a valid lease or sub-lease between November 26, 2007 and December 2, 2007 will be eligible. This is designed to establish that the tenant filing the claim has standing to receive the payment. Any questions can be referred to the Claims Center.
4) Lessees(s) with a lease start date of December 1, 2007 will be eligible for a two day allowance, for a total of $1,500. If your lease end date is November 30, 2007, you will be eligible for a four day allowance, for a total of $3,000.
5) For those tenants whose total claim exceeds $6,000, you may provide documentation in the form of bills and receipts with an itemized list describing your claim. Your documentation can be dropped off at our Center. Include all contact information and your Apartment number. We will contact you in the near future to resolve your claim.
6) Any tenant who filed a first-party claim with any type of insurance carrier will have to specifically notify the Claims Center regarding that claim. Payment cannot be issued until we have documentation of your first-party claim.
THERE WILL BE A COMMUNITY BOARD 1 MEETING TONIGHT TO DISCUSS 90 WESTI won't be able to make this meeting, it's too early. But I would strongly recommend anyone who can attend do so.
Financial District Committee
DATE: Wednesday, December 5, 2007
TIME: 6:00 PM
PLACE: Community Board #1 Office49-51 Chambers Street, Room 709
Agenda
2) Update on 90 West Street by Peter Levenson, Partner, 90 West Street
I received this information from Tom Goodkind, a member of the Community Board, and he would like the residents to be present for this meeting to get information on residents’ experiences, good and bad, so that the Community Board can work in assisting 90 West residents and put recommendations in place for the future.
Dear ResidentsMeanwhile, the Riddle Associates blog has promised the protocols for handling claims today. Keep an eye on that blog to see how things will proceed from here.
We are happy to report that all the environmental tests that have been preformed have come back negative. That means that there is no evidence of any of contaminants in the residential areas of the building. Furthermore we have received the water testing report which also showed no traces of contamination. These tests show that water which is coming out of your tap is just as pure as in every other location in Manhattan. All the test results have been posted on the web site.
Yesterday we met with all relevant city agencies including the Board of Health and the Department of Environmental Protection. They confirmed that we have done everything needed to reoccupy the building and have no further concerns.
We are extremely sorry about what happened. We have done everything possible to minimize the inconvenience, and we are very happy to welcome everyone home for the Holidays.
90 West Street
We just received the results of the testing performed on the drinking water. All results were negative for any presence of Total Coliform or E. Coli.It's good to have confirmation, certainly. Though I have to admit, I belong to the group that was not overly concerned about the water. I believe that neither the City's HPD nor the building management would have cleared the building to allow residents back in if there were concerns. The liability that entails would be staggering.
We also received the test results of the areas on the upper floors that required additional cleaning after our preliminary testing on November 30. These results also came back negative of any Total Coliform or E. Coli.
We are waiting for the results of three additional areas that were re-tested in the mailbox area and two elevators after the preliminary test. As soon as the results of these tests become available they will be posted.
Please see attached report.
These tests were performed by Professional Environmental Services.
Here's the relevant excerpt:
Please see attached lifting of the vacate order by HPD
You are hereby informed that vacate order #61805 issued for the above-referenced premise [90 West] on November 26, 2007 has been rescinded as a result of a vacant building survey inspection concluded on December 3, 2007. It was reported at that time that the hazardous conditions cited in the vacate order have been sufficiently abated.
90 West ResidentsA few residents have expressed concerns about the water and air quality, hence the last paragraph of the notice. Lynn and I are definitely moving back in tomorrow, leaving Connecticut early in the morning to drop our stuff at our apartment before work. We're both tired of moving around, and anxious to be in our own place again. It will be good to be home.
New York City’s housing office has advised us that residents can now reoccupy 90 West Street.
Please note that the sewage leak happened at a time of sustained rain and high tide and that the water did not rise above the cellar level.
As discussed we have retained our own environmental testing company. The company advised extensive tests to determine if there was any residue on the floor from the flood. We preformed a round of preliminary tests to determine the background level of contaminants. The test showed that most of the building was clean. We used those results (which are posted on our web site) to plan the final phase of cleaning. We decided based on the tests to clean all the public hall carpets before the residents return. The hallways are complete. The cellar has been cleaned and re-cleaned. Work will continue down there for a few months. We will be replacing doors and painting all the surfaces. We will be installing new equipment in place of temporary equipment. We will also be installing additional dehumidification equipment.
With the water now running we have ordered water quality tests. Both the DEP and our Plumbers have advised that the possibility of water contamination is extremely remote. The results of the water tests will be available from the lab tomorrow afternoon. Until we have the final results you should refrain drinking or cooking with the tap water. The results of the water test will be made available as soon as we get them.
The bottom line is that we want you to feel safe when you return to 90 West Street. If you decide that you want to wait for the results of tomorrow’s tests then you should stay in your hotel until Wednesday. The PA has not confirmed they will reimburse you for the additional night however, we will do everything in our power to make sure your additional expenses are reimbursed.
90 West Street.